Sealcoating in Fort Collins

Asphalt Coatings Company

Asphalt Coatings Company sealcoats Fort Collins commercial parking lots, with crack sealing before the coat and new striping once it cures.

Two crew members spraying sealcoat across a commercial lot with spray wands

Get a Free Fort Collins Sealcoating Quote

Itemized pricing comes in a written scope before any work starts.

Commercial properties only: HOA, multifamily and municipal sites included.

What services do you need? Required. Choose one or more.
0 / 180

Free on-site estimate. No obligation.

When Sealcoating Helps a Fort Collins Parking Lot

Sealcoating protects sound asphalt that has started to gray, while potholes, a failed base and wide cracks need repair before any sealcoat goes down.

These signs mean a parking lot is ready for sealcoat.

  • Asphalt that has faded to gray as it oxidizes
  • Narrow cracks that crack sealing can close first
  • Pavement that stays intact under traffic

Repair has to come before sealcoat when a parking lot shows any of these.

  • Potholes or large, open cracks
  • Alligator cracking from a failed base
  • Water standing in ruts, or loose stone on the surface

Pricing waits until we know why the pavement failed. Each problem then gets its own fix: crack sealing for cracks, a cut-out or infrared patch for failed patches, and possibly a new top layer when the whole parking lot is worn out.

Parking lot taped off while fresh sealcoat cures

How Sealcoating Works

We inspect and measure the parking lot, prepare the surface, apply the sealcoat, then restripe once it cures and walk the result with you.

  • Inspect and Measure

    First we measure the area and look over the pavement for oxidation, cracks, drainage trouble and oil stains, marking any damage to repair before the sealcoat.

  • Prepare the Surface

    Preparation covers three jobs: power blowers clear dirt, debris and loose material so the sealant bonds, oil stains get a primer with hand edging along curbs and buildings, and the cracks are filled with hot-pour rubberized sealant so the sealcoat covers a surface that sheds water.

  • Apply the Sealcoat

    Our truck-mounted spray system puts the sealcoat down in an even coat, and sand in the mix gives tires grip on drive lanes where cars brake and turn.

  • Restripe After It Cures

    For the 24 to 48 hours the sealcoat needs to cure, the parking lot is kept dry and closed to traffic. After that, every stall line, arrow and marking is painted again.

    Last, we walk the finished parking lot with you and set a date for the next sealcoat.

Sealcoating Season in Fort Collins

We sealcoat Fort Collins parking lots in the warm months between the last spring freeze and the first fall freeze.

At Fort Collins' climate station the last spring freeze typically comes around May 2 and the first fall freeze around October 7. Before sealcoat goes down we need the air at 50 F and rising, with 24 dry hours in the forecast, and a poor forecast moves the date.

Traffic, weather and the condition of the asphalt decide how often any one parking lot needs it, so we confirm the timing when we see yours.

UV gets stronger with altitude because thinner air absorbs less of it, and the station sits at about 5,004 feet, with about 30 days a year at 90 F or hotter. Strong sun hardens the binder in asphalt and turns it brittle from the top down, and sealcoat is the layer that shields it from that wear.

NOAA reports place hail in and around Fort Collins on 10 separate days from 2015 to 2024, with stones up to 1.75 inches, and the free assessment after a hail season includes a look at the sealcoat and markings on your parking lot.

Fresh black sealcoat and new white stall lines beside a curb island and a red paver walk

Frequently Asked Questions

These are common questions about sealcoating a Fort Collins parking lot.

Cost and Scheduling

What Does Parking Lot Sealcoating Cost in Fort Collins?

We price each parking lot after a free on-site assessment, and the written scope you receive itemizes the work before any of it starts. You can also contact our Fort Collins office.

When Can Cars Park on New Sealcoat?

Usually 24 to 48 hours, depending on the weather, and the surface must stay dry with no traffic until the cure is complete. A parking lot with several sections is done in phases, so one part closes at a time while barricades, signs and cones mark off the area that is curing.

Is Night or Weekend Sealcoating Available?

Yes. If closing sections during business hours won't work for your property, book the sealcoating for a night or a weekend.

Scope

Is Restriping Needed After Sealcoating?

Yes. Fresh sealcoat buries the existing markings under an even black surface, so new lines are part of every sealcoated parking lot. We book sealcoating and restriping together, and the paint goes down after the sealcoat cures.

Can You Sealcoat My Residential Driveway in Fort Collins?

No. Asphalt Coatings Company takes commercial jobs only, with apartment communities and HOAs among them.

Can Sealcoating Go Into a Parking Lot Maintenance Plan?

Yes. Our multi-year maintenance programs schedule crack sealing, sealcoating and repairs in advance, which lets a property manager budget each year before it starts. See parking lot maintenance in Fort Collins.